After each opening, crews will reopen the travel lanes on the bridge to allow any traffic.

And 4 a. m.

Background music provided by the super jazz band.

A series of overnight bridge test openings, lasting up to 20 minutes each, sept.

Recommended for you

Bridge openings are not scheduled from 5 to 8.

To 5 a. m.

Coleman memorial bridge, route 17:

Coleman memorial bridge (route 17) next week, each lasting.

Read the full traffic.

And 4 a. m.

The virginia department of transportation (vdot) has announced they will be conducting a series of test openings at the george p.

The virginia department of transportation is performing a series of overnight test openings this week on the george p.

Bridge openings and travel conditions.

On thursday, according to vdot.

After each opening, crews will reopen the travel lanes on the bridge to allow any traffic.

Coleman memorial bridge on route.

Transportation (vdot) bridge crews are scheduled to perform a series of test openings on the george p.

(wavy) — the coleman bridge is back in operation after an extended lift that kept it in the open position friday afternoon, but has since reopened to traffic.

An opening on the coleman bridge is scheduled for 12:30 p. m.

An opening on the coleman bridge is scheduled for 12:30 p. m.

You may also like

The coleman bridge opens upon vessel demand, according to federal regulations.

Motorists can expect potential delays in this area.

Vdot bridge crews are scheduled to perform a series of overnight test openings on the george p.

The test openings are necessary for balance testing.

They are scheduled between 10:00.

Coleman memorial bridge (route 17) this week, each lasting approximately 20 minutes or.